Crossing the lines, stepping outside the box and even lining up incorrectly are all familiar warnings; for NonStop architects, lines on whiteboards or napkins oftentimes convey complexity that needs expertise to address … I have been involved with the building of three homes. With each home, the engagement differed as the starting place varied, but there was always a blueprint on hand. In the southern suburbs of Sydney, Lilli Pilli, the home was already standing and it was down to details. However, I did get to finish out the lower level, lay the bricks for the backyard retaining pool and come up with the design of the swimming pool. As for my home in Niwot, North East of Boulder, I started with a blank piece of paper and took many months before settling on the final blueprint of my dream three-level home. Every detail was covered in those blueprints when breaking ground commenced, but even so, when it came time to move in, there were additional lines drawn on the orig...
Independent opinions and commentary for the HPE NonStop community.